Return to our home page Request a new AC inspection Some useful reference material Read some of our testimonials Useful links Contact us
Call us now for further information: 0161 337 4353

AC-inspect.co.uk :: providing Air Conditioning Inspections for the UK market

Responsibilities for ensuring inspections are done

If you control the operation of an air conditioning system affected by these Regulations, it is your responsibility to:

  • ensure an inspection has been done in accordance with the requirements and timetable of the Regulations
  • keep the most recent inspection report made by an energy assessor
  • give any inspection report kept by you to any person taking over your responsibilities with respect to the control of the air conditioning system

If you have taken over control of an air conditioning system from 4 January 2011 and you haven’t been given an inspection report, you must ensure the system is inspected within three months of taking over such control.

top of page


What Energy Consulting Engineers Limited
Low Carbon ConsultantsSAP